BEPC INTEGRATED TEST CENTER

Client: Basin Electric Power Cooperative
Architect: Sargent & Lundy
Location: Gillette, Wyoming
Completion Date: 2018
Delivery Method: General Contractor
MORE PROJECTS

The Integrated Test Center located adjacent to the Basin Electric Dryfork Station provides approximately 226,000 SF of test space for the capture, sequestration and utilization of Carbon Dioxide provided via the 18 MW of flue gas directed to the contestant sites. The areas are divided into 5 Small Test Sites, and 1 Large Test Site.
This project is one of a few in the world that provides an opportunity for testing new technologies at an operating plant in “real world” conditions. For additional information regarding the ITC or the tenants, please visit http://www.wyomingitc.org/